MBS by BERD in PROMOTE 2022

View more news

MBS by BERD will be present on the 8th Edition of “PROMOTE 2022 – Yaoundé International Business, SME and Partnership Fair” that will be held from 19 to 27 February in Palais des Congrès de Yaoundé, in the Republic of Cameroon.

View more news

MBS by BERD modular steel bridges offer top performance, resisting to extreme temperatures, humidity, sun rays and chemically aggressive conditions. Our fully hot-dip galvanized elements are adapted to use, ensuring high resistance, durability, and minimum maintenance.

View more news

ANE, the agency responsible for the contract of supply of 40 modular metallic bridges to Mozambique, visited the factories responsible for the production of BERD bridges.

After the technical training on BERD products and services that took place in Portugal, this time ANE’s technicians team were able to appreciate our manufacturing and quality processes.

View more news

Technicians from ANE (Mozambique National Road Administration), the agency responsible for the contract for the supply of 40 modular bridges to Mozambique, visited our facilities and some BERD engineering works in Portugal.

This visit also included a technical training on our products and services.

View more news

Another shipment completed!

This time, this MBS by BERD metallic modular bridge will cross the Atlantic and head for northern Canada, following a tender by the Department of Transportation and Infrastructure of New Brunswick (DTINB). With a span of 27 meters, and prepared for hard weather conditions of this region, its installation is scheduled for spring 2022.

View more news

Another BERD modular bridge installation in Peru has been completed. The Pilpinto Bridge of 61.6 meters span, located in the province of Cusco, was inaugurated in an atmosphere of great joy by local and regional authorities. This infrastructure has reestablished communication between the provinces of Acomayo and Paruro, which had been separated in 2020 after the collapse of the bridge linking these two areas.

MBS by BERD, Approaching Margins….Connecting the World!

View more news

We will be present at  III Congreso Internacional de Puentes 2021 in Chile, that will be held Online from 27 to 29 October.

We will be presenting the Paper “Monitoring solutions for large movable scaffolding systems and modular bridge” on October 27th at 18.00 (local time), in the Session IV: Monitoreo Estructural.

You won’t want to miss either the presentation “Nuevas fronteras – Innovación en Puentes Modulares”, that will take place under our Gold Sponsorship. 

Hope to see you online!

View more news

MBS by BERD won, in consortium with the Turkish company Mim Mühendislik İnşaat Çelik End. San. Tic. A.Ş., the tender launched by ANE (Mozambique National Road Administration) for the supply of 40 metallic bridges in Sofala province.

This project, financed by the World Bank, is part of the Integrated Rural Roads Development Program (IFRDP) and aims to improve road accessibility in rural areas of the provinces of Nampula and Zambézia.

The modular bridges, with spans between 30 and 60 meters, will be supplied with 3 sets of installation and launch equipment at ANE warehouses in Dondo, Beira.

View more news

BERD was awarded the COTEC 2021 INNOVATIVE Statute, in recognition of the high standards of financial strength, innovation skills and economic performance achieved.

Cotec’s Innovative Statute is the result of a partnership between the financial sector institutions and Cotec in order to distinguish companies with superior performance through example recognition, increase of notoriety and value reinforcement by the market.

This is a public recognition given to 566 Portuguese companies that, due to their high performance in innovation and notoriety, are an example of value creation at a national level.

MBS Steel Modular Bridges in Peru View more news

Today we smile! The installation of the Modular Bridges that MBS supplied to Provías Descentralizado in 2019 is making good progress.

Due to the pandemic situation in the world, the installations scheduled to 2020 have suffered some delays but today the Peruvians already have 6 MBS modular bridges installed.

After the installation of Silaco Bridge in March last year in the districts of Chimbán and La Ramada, two of the most deprived districts in this country, the installations were suspended and only restarted by the end of 2020.

In Pozuzo district two prefabricated steel bridges have been installed: Santa Matilde and Yanahuanca. These bridges have already been opened to traffic just in time to support circulation during the rainy season

In Puno and Cusco tree more bridges that are supporting neighboring populations to move safely and comfortably have been installed.

In the department of Tacna, a flood of the Locuma River caused severe damage to two bridges and affected the populations of Sagollo, Huancarane, Oconchay, Mirave, Ilabaya, Chululuni and Alto Camialaca. The 2256 inhabitants of this region already can transit over the newly installed Chipe modular bridge and, in the next few weeks, will take place the Sagollo bridge installation.

The processes for the installation of more than 40 MBS Modular Bridges in 2021 are in progress.

Today we smile because we keep connecting communities, improving quality of life of populations.

In case of dispute the consumer can resort to an Alternative Dispute Resolution Body:

CICAP – Tribunal Arbitral de Consumo
Rua Damião de Góis, 31, Loja 6, 4050-225, Porto
+351 22 550 83 49 / +351 22 502 97 91
cicap@cicap.pt

More information at Portal do Consumidor www.consumidor.pt